My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Contracts & Agreements_24-2017
Kiosk Weblink
>
City Clerk
>
Contracts & Agreements
>
Cooperative Agreement
>
City of Highland bike lane conntecotr project
>
24-17
>
Contracts & Agreements_24-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 12:45:04 PM
Creation date
3/20/2017 9:13:57 AM
Metadata
Fields
Template:
Contracts & Agreements
Subject
Cooperative Agreement
Details
City of Highland bike lane conntecotr project
Date
2/7/2017
Document Number
24-2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Northwest end of the existing bridge over Plunge Creek <br /> • Southeast end of the existing bridge over Plunge Creek <br /> g Install new solar powered decorative LED pedestrian lights and appurtenances on the <br /> proposed Class I bikeways along Orange Street north of City Limit Line, and within the <br /> Lot"Y"easement between Orange Street and Streater Drive <br /> h Construct solar powered speed feedback signs and appurtenances along Orange Street <br /> between Plunge Creek and the CEMEX Entrance (two required) <br /> 1 Install new bicycle traffic signal heads and appurtenances on the existing traffic signal at <br /> the intersection of Orange Street and the CEMEX Entrance within Highland <br /> Install pedestrian countdown heads on the existing traffic signal at the Orange <br /> Street/Greenspot Road intersection for the south and east legs of the intersection (four <br /> required) <br /> k Install in-roadway bicycle detection systems and appurtenances at signalized intersections <br /> within Project limits in Highland, including all bike lane approaches at each of the <br /> following <br /> • Orange Street/CEMEX Entrance <br /> • Boulder Avenue/Greenspot Road <br /> • Greenspot Road/Orange Street <br /> • Base Line/Streater Drive <br /> 1 Install in-roadway bicycle detection systems for the lighted crosswalk on Glenheather <br /> Dnve/Love Street/Church Street intersection. <br /> in Install new bike racks and appurtenances at. <br /> • Beattie Middle School (one) <br /> • Highland Grove Elementary School (one) <br /> n Apply thermoplastic pavement striping and pavement markings within Project limits in <br /> Highland, including <br /> • Travel Lanes <br /> � D1kV LRI.IVA <br /> • Sharrows <br /> Crosswalks <br /> Striped Buffers <br /> o Apply slurry seal on streets within Project limits in Highland,including <br /> J\City Council Reports\Mumcipal Utilities&Engineenng\2017\2 7 17\RCA-Highland Redlands Bike Project <br /> Cooperative Agreement\ATP Cycle Agreement-Word version 1 30-17 docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.