My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7744
Kiosk Weblink
>
City Clerk
>
Resolutions
>
Consultants
>
Qualified Environmental Consultants
>
7744
>
7744
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2017 7:39:47 AM
Creation date
7/25/2017 7:39:34 AM
Metadata
Fields
Template:
Resolution
Subject
Consultants
Details
Qualified Environmental Consultants
Resolution Number
7744
Date
7/24/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 Majoi projects not subject to an Envnromnental Impact Report and/or not located in the <br /> Resource Preservation, Resource Conservation, or Flood Control/Construction <br /> Aggregates Habitat/Habitat Preservation land use designated areas shall have <br /> environmental studies contracted through the City and paid for by the applicant (e g , <br /> Initial Studies for Negative Declarations or Mitigated Negative Declarations) The <br /> applicant may prepare and submit up to three envi oiunental technical reports, which <br /> shall be prepared by consultants from the City's approved consultant list, and may be <br /> subject to third-party peel review contracted through the City and paid for by the <br /> applicant <br /> 5 All supporting environmental and/oz engineering tecluiical reports prepared by the <br /> applicant (if any) shall be completed to the satisfaction of staff <br /> Other general guidelines <br /> 6 Applicants frequently prepare one or more engineering reports prior to application <br /> submittal to the City, as such reports inform and assist the applicant with designing <br /> thea project prior to submittal (e g , soils report, preliminary hydrology report, <br /> piellminary drainage/grading plan, geotechnical engineering report, slope stability <br /> analysis, Phase 1 or 2 ESA reports, etc) Such reports may be considered to be <br /> engineering reports, and not as environmental teelmical reports Such reports shall <br /> be prepared by Calzfoznia-licensed engineering professionals (when applicable) and <br /> need not be consultants from the City's approved list <br /> 7 From tinne to time, depending in project site conditions or surroundings, <br /> engineering technical reports may zequxre independent peer review (by <br /> professionals with equivalent licenses of qualifications) depending on the facts and <br /> circumstances of a specific property Examples of studies that may require peer <br /> review include a geotechnical report for a project located within or near an <br /> Alquist-Priolo Earthquake Fault Zone, a slope stability analysis for hillside <br /> properties or potentially unstable slopes, a Phase 1 or 2 envirozunental site <br /> assessment or site investigation for any property with possible contamination or <br /> hazardous materials In such cases, the Applicant may be required to conduct <br /> further work at thein own cost, and revisehesubmit techrucal reports to the <br /> satisfaction of City staff <br /> S Certain environmental technical studies may be dependent on timing or ainrival <br /> seasons to produce a valid study and valid conclusions Examples include <br /> biological habitat assessments during the Spring season, wildlife surveys during the <br /> peak seasonal activity period of a given species, or traffic studies near schools <br /> when in session, or other unique traffic generators Applicants may choose to <br /> prepare one or more technical report(s) in the interest of expediting the processing <br /> of their project, the City may require a third-party peel 1 eview contracted through <br /> 3 <br /> I\cclerklResolutions\Res 7700-779917744 - enviroiuuental procedures docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.