Laserfiche WebLink
RECORDING REQUESTED BY <br />AND WHEN RECORDED MAIL TO <br />CITY CLERK <br />CITY OF REDLANDS <br />P O BOX 3005 <br />REDLANDS, CA 92373 <br />FEES NOT REQUIRED <br />PER GOVERNMENI CODE <br />SECT0 6143 <br />Electronically Recorded in Oficial Records County of San Bernardino <br />BOB DUTTON <br />ASSESSOR RECORDER CLERK <br />" 367 City of Redlands Clerk <br />Doc# 2018-0371823 Miles 1 <br />Fees <br />SPACE ABOVE TI IIS LINE FOR RECORDER S USE <br />Taxes <br />CA 562 Fee <br />Others <br />Paid <br />STORMWATER TREATMENT DEVICE AND CONTROL MEASURE ACCESS <br />AND MAINTENANCE AGREEMENT <br />Assessor's Parcel Number(s) <br />0175-461-03 <br />10110112018 <br />04:73 PM <br />SG <br />Pages 10 <br />00 <br />00 <br />00 <br />00 <br />00 <br />THIS AGREEMENT is made and entered into this y day ofc3�i as3 C , 20 !$ by <br />and between Lambeth Capital, LLC ("Owner"), and the City of Redlands, a municipal corporation <br />("City") The Owner and the City are sometimes each individually referred to herein as a `Party" <br />and, collectively, as the '-Parties <br />RECITALS <br />WHEREAS, the Owner owns real property ("Property") m the City specifically described in <br />Exhibits "A" and "B" which are attached hereto and incorporated herein by this reference, and <br />WHEREAS, at the time of approval of the Owner's development project commonly known <br />as 1611 Smiley Ridge, Redlands, CA 92373, Tract 12808, Lot 21 (the "Project''), the City required <br />the Project to employ oil -site control measures to minimize pollutants in urban storrnwater runoff, <br />and <br />WHEREAS, the Owner has chosen to install Bio -Retention trench basins with no <br />underground drains and Filtrex Inserts or equal at area drains (the "Devices') to minimize <br />pollutants in Urban stormwater runoff, specifically described in Exhibit 'C" and shown in Exhibit <br />"D" both of which are attached hereto and incorporated herein by this reference, and <br />WHEREAS, the Devices have been installed in accordance with pians and specifications <br />approved by the City and referred to as the Water Quality Maintenance Plan, and <br />City of Redlands <br />Agreement Version NOVEMBER 2013 <br />