Laserfiche WebLink
CONTRACT AGREEMENT <br />THIS AGREEMENT, made and concluded, in duplicate, this day of Septemoejr 19 �.q , <br />between the City of Redlands, party of the first part, an <br />E. L, YeaEer Company , Contractor,, party of the second part. <br />ARTICLE I. UTITNESSETH, that for and in consideration of the payments and agree- <br />ments hereinafter mentioned, to be made and performed by the said party of the first <br />part, and under the conditions expressed in the two bonds, bearing even date with these <br />presents, and hereunto annexed, the said party of the second part agrees with the said <br />party of the first part, at his own proper cost and expense, to do all the work and <br />furnished by said party of the first part, necessary to construct and complete in a <br />good, workmanlike and substantial manner, the improvement of Fourth Street from Citrus <br />Avenue to Olive Avenue, in accordance with the special provisions therefor, and also <br />in accordance with the specifications entitled "State of California, Department of <br />Public Works, Division of Highways, Standard Specifications, August 1954", which said <br />special provisions and standard specifications are hereby specially referred to and <br />by such reference made a part hereof. <br />Said work to be done is shown upon plan included in "Four-thStreet <br />Construction Project No. 10211, which said plans are hereby made a <br />part of this contract. <br />ARTICLE 11. And the said Contractor agrees to receive and accept the following <br />prices as full compensation for furnishing all n;aterials and doing all the work con- <br />templated and embraced in this agreement; also for all loss or damage arising out of <br />the nature of the work aforesaid, or from the acts of the elements, or from any <br />unforeseen difficulties or obstructions -%hick may arise or be encountered in the <br />prosecution of the work until its acceptance by the City of Redlands, and for all <br />risks of every description connected with the workg also for all expenses incurred <br />by or in consequence of the suspension of discontinuance of work and for well and <br />faithfully completing the work, and the whole thereof, in the manner and according <br />to the plans and specifications, and the requirements of the Engineer under them, <br />to wit: <br />Item Quantities <br />Item With Unit Price Written In Words <br />Unit <br />Price <br />TOTAL <br />1 <br />59O <br />Cubic yards of roadway excavation <br />Lump <br />Sum <br />$ <br />2300.00 <br />2 <br />245 <br />Cubic yards of Portland Cement Concrete, <br />in place, at Twenty -Seven <br />dollars and no cen s <br />per cu. yds. <br />27.00 <br /># <br />6615.00 <br />3 <br />L <br />Curb inlet boxes per City of Redlands <br />Detail Dra7ving No. 301 installed <br />Lump <br />Sum <br />700.00 <br />4 <br />11.5 <br />Linear feet of reinforced concrete box <br />culvert per Detail Drawing, in place, at <br />Ten dollars <br />l <br />and Fifty cents per in. ft. <br />$ 10. 0 <br />$ <br />12_ O7.50 <br />5 <br />250 <br />Cubic yards of imported base material, <br />in place, at Two <br />dollars and lnnet <br />2.90 <br />cents per cu. y . <br /># <br />$ <br />725.00 <br />