My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Contracts & Agreements_2-1961
Kiosk Weblink
>
City Clerk
>
Contracts & Agreements
>
Independent Contractor Agreement
>
Robert Simon Sanitary Sewer Relocation Project III
>
2-61
>
Contracts & Agreements_2-1961
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 3:27:38 PM
Creation date
6/25/2019 10:37:59 AM
Metadata
Fields
Template:
Contracts & Agreements
Subject
Independent Contractor Agreement
Details
Robert Simon Sanitary Sewer Relocation Project III
Date
1/17/1961
Document Number
2-1961
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C 0 N T R A C T <br />Contract for the construction of a sanitary trunk sewer line in the City of <br />Redlands. <br />This Agreement, made and concluded, in duplicate, this 18U day of JanuarY , <br />19 bl , between the City of Redlands, arty of the first part, and <br />Robert Simon, Contractor <br />Contractor, party of the second part. <br />Article I. Witnesseth, that for and in consideration of the payments and <br />agreements hereinafter mentioned, to be made and performed by the said party of <br />the first part, and under the conditions expressed in the two bonds hereunto <br />annexed, the said party of the second part agrees with the said party of the <br />first part, at his %!n proper cost and expense, to do all the work and furnish <br />all the materials, except such that are mentioned in the specifications to be <br />furnished by said party of the first part, necessar,- to construct and complete <br />in a good, worl-ananlike and substantial manner and to the satisfaction of the <br />City of Redlands: <br />Said work to be done in shown in part upon. a plan entitled "Sanitary <br />Sewer Relocation, Project II". Said work shall be in accordance with <br />Standard Specifications entitled "Sanitary- Sewer Relocation, Project II?". <br />Article II. And the said Contractor agrees to receive and accept the <br />following prices as full compensation for furnishing all materials and for <br />doing all the work contemplated and embraced in this agreement; also for all <br />loss or damage arising out of the nature of the work aforesaid, or from the <br />action of the elements, or from any unforeseen difficulties or obstructions <br />which may arise or be encountered in the prosecution of the work until its <br />acceptance by the City of Redlands, and for all risks of every description <br />connected with the work; also for all expenses incurred by or in consequence <br />of the suspension or discontinuance of work and for well and faithfully complet- <br />ing the work, and the hhole thereof, in the manner and according to the plans <br />and specifications, and the requirements of the Lngineer under them, to wit: <br />ITEM WITH UNIT PRICE UNIT TOTAL <br />ITEM QUANTITIES WRITTEN IN WORDS PRICE PRICE <br />1 Lump Sum Clearing of approximately 1700 <br />linear feet of right -of r:a;; prior <br />to construction C) Two lhmdred <br />--- Dollars <br />and <br />cents. _ Lump Sum 200•00 <br />2189 lin. ft. 8-inch extra strength vitrified <br />clay pipe in place. @ <br />Four Dollars <br />and V�Y-Elov_� <br />Cents per lin. ft. 4.48 $9806.72 <br />3 2252 lin. ft. 21-inch extra strength vitrified <br />clay pipe, in place,@ <br />Ten Dollars <br />and Seventy --Nine <br />Cents per lin. ft, $ 10.79 4,4,299.08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.