Laserfiche WebLink
An engineering study of rehabilitating the <br />existing 7. 5-million gallon. Dearborn Reservoir, <br />complete with preliminary cost estimate, and <br />estimated costs of alternative types of reservoirs <br />to replace the existing reservoir to provide storage <br />of approximately 20-million gallons. Estimates to <br />include Engineering and Inspection Fees. <br />C. Detailed Scope - Design Phase. <br />Upon submission by the ENGINEER, of the comparison study <br />to the CITY, the City Council shall make the determination as <br />to whether or not the ENGINEER is to proceed with design <br />and will select the design alternate. <br />(1) If the CITY informs the ENGINEER in writing that <br />no further work will be required of them on this <br />project, the contract will be terminated then. <br />(2) If the ENGINEER is advised to proceed with a <br />specific alternative design for construction, the <br />engineering services �,vhich shall be provided 'by <br />the ENGINEER shall include 'but shall not .necessarily <br />be limited to the following: <br />(a) Review of foundation investigations. <br />('b) Detailed plans and specifications for con- <br />struction of the reservoir and appurtenances. <br />Ten sets' of plans and specifications <br />shall be furnished to the CITY. Additional <br />copies shall 'be available at actual cost of re- <br />production and as s em'bly. <br />(c) Detailed estimate of quantities and construc- <br />tion costs. <br />(d) Assistance in obtaining bids and analysis of <br />bids and recommendations as to award of <br />contract. <br />(e) Assistance during construction, including review' of <br />shop drawings and normal administration of <br />construction contract. <br />(f) Field work including detailed inspection and <br />construction staking. <br />M <br />