My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Contracts & Agreements_18-1970
Kiosk Weblink
>
City Clerk
>
Contracts & Agreements
>
Independent Contractor Agreement
>
L. D. King Engineering Company Inc
>
18-70
>
Contracts & Agreements_18-1970
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2019 8:56:29 AM
Creation date
7/29/2019 2:45:18 PM
Metadata
Fields
Template:
Contracts & Agreements
Subject
Independent Contractor Agreement
Details
L. D. King Engineering Company Inc
Date
8/25/1970
Document Number
18-1970
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
suppliers and manufacturers whose products are to be <br />incorporated in the project. <br />A. ENGINEER shall furnish the services of one inspector. <br />B. CITY shall supply supplemental inspectors for inspec- <br />tion of construction and inspection of operations of <br />suppliers and manufacturers as required, who shall be <br />satisfactory to ENGINEER. ENGINEER, together with <br />CITY, shall determine the amount of supplemental <br />inspection required. <br />C. ENGINEER shall furnish supplemental specialized inspec- <br />tion as required to include, but not be limited to, <br />structural. ENGINEER shall furnish inspection as <br />required at prestressed concrete plant. <br />2. TESTING <br />If such services are not otherwise provided for by CITY, <br />ENGINEER shall engage the services of a competent testing <br />laboratory satisfactory to CITY at a compensation rate <br />satisfactory to CITY bo perform such tests as in ENGINEER'S <br />judgment are required to insure satisfactory conformance <br />of materials to the requirements of the specifications. <br />3. CONSTRUCTION STAKEOUT <br />ENGINEER shall provide control stakeout of the project <br />providing necessary stakes to establish alignment, eleva- <br />tions, and references from which the Contractor or CITY, <br />if it so elects, can proceed with construction stakeout. <br />4. MONTHLY PROGRESS PAY ESTIMATES <br />A. ENGINEER shall prepare monthly reports setting forth <br />the quantities incorporated in the work and showing <br />monies earned by and due the Contractor at the end <br />of the month. Said forms shall be checked and then <br />delivered to CITY with recommendation for periodic <br />- 2 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.