Laserfiche WebLink
suppliers and manufacturers whose products are to be <br />incorporated in the project. <br />A. ENGINEER shall furnish the services of one inspector. <br />B. CITY shall supply supplemental inspectors for inspec- <br />tion of construction and inspection of operations of <br />suppliers and manufacturers as required, who shall be <br />satisfactory to ENGINEER. ENGINEER, together with <br />CITY, shall determine the amount of supplemental <br />inspection required. <br />C. ENGINEER shall furnish supplemental specialized inspec- <br />tion as required to include, but not be limited to, <br />structural. ENGINEER shall furnish inspection as <br />required at prestressed concrete plant. <br />2. TESTING <br />If such services are not otherwise provided for by CITY, <br />ENGINEER shall engage the services of a competent testing <br />laboratory satisfactory to CITY at a compensation rate <br />satisfactory to CITY bo perform such tests as in ENGINEER'S <br />judgment are required to insure satisfactory conformance <br />of materials to the requirements of the specifications. <br />3. CONSTRUCTION STAKEOUT <br />ENGINEER shall provide control stakeout of the project <br />providing necessary stakes to establish alignment, eleva- <br />tions, and references from which the Contractor or CITY, <br />if it so elects, can proceed with construction stakeout. <br />4. MONTHLY PROGRESS PAY ESTIMATES <br />A. ENGINEER shall prepare monthly reports setting forth <br />the quantities incorporated in the work and showing <br />monies earned by and due the Contractor at the end <br />of the month. Said forms shall be checked and then <br />delivered to CITY with recommendation for periodic <br />- 2 - <br />