Laserfiche WebLink
JOHN CAROLLO ENGINEERS <br />\ \ PHOENIX LAFAYETTE SANTA ANA EL PASO <br />ARIZONA CALIFORNIA GA EFORN3P', , TEXAS <br />JOHN A. CAROLLO, P. E. <br />H. HARVEY HUNT, P. E. <br />HOWARD M. WAY, P. E. <br />ROBERT G. WILLIAMS, P.E. <br />DONALD R. PREISLER, P. E. <br />City of Redlands <br />City Council <br />City Hall <br />Redlands, California 92373 <br />Attention: Mr. John Shone <br />Subject: Engineering - Treatment Plant Facilities <br />Gentlemen: <br />1523 SOUTH GRAND AVENUE <br />SANTA ANA, CALIF. 92705 <br />AREA CODE: (714) B35-1373 <br />August 30, 1971 <br />This letter constitutes our proposal to perform certain <br />engineering services the City will require inorder to carry out <br />recommendations contained in our forthcoming report on "Waste- <br />water Treatment and Disposal Facilities". This report is pres- <br />ently in a preliminary draft state, and copies of same will be <br />forwarded to the City for their review and preliminary approval <br />following receipt of tentative discharge requirements from the <br />Regional Water Quality Control Board. <br />As required by the Regional Board, the City has forwarded <br />a proposed time schedule outlining the events that will occur <br />during the report phase -design phase -construction phase of this <br />proposed project. Inorder to meet certain deadlines contained <br />in said schedule, it is most important that we proceed immediately <br />on various aspects of the design, including the project report that <br />must be forwarded as soon as possible to State --Federal agencies <br />for approval. <br />We will provide detailed plans and specifications and other <br />related services as herein set forth: <br />DETAILED PLANS AND SPECIFICATIONS <br />We will render the following engineering services in con- <br />nection with the design of the treatment facilities: <br />(l) Assist in application for public grants to offset the <br />cost of construction of the treatment facilities, including preparing <br />and submitting a Project Report to the State Water Resources <br />Control Board. <br />