My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Contracts & Agreements_25-1972
Kiosk Weblink
>
City Clerk
>
Contracts & Agreements
>
Independent Contractor Agreement
>
James M. Montgomery Consulting Engineers Inc
>
25-72
>
Contracts & Agreements_25-1972
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2019 10:47:29 AM
Creation date
8/8/2019 2:32:15 PM
Metadata
Fields
Template:
Contracts & Agreements
Subject
Independent Contractor Agreement
Details
James M. Montgomery Consulting Engineers Inc
Date
10/17/1972
Document Number
25-1972
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE III. FEES <br />A. Detailed Design of Reservoir. <br />The fees for furnishing engineering services in connection with <br />detailed design of the reservoir, Article II fB') Subparagraphs <br />(2), (3), (4), (5), and (7), shall be limited to an amount calculated - <br />as a percentage of the net construction cost of the project. The <br />net construction cost is defined as the total cost of construction <br />including all change orders, but exclusive of costs of land, ease- <br />ments, engineering, field surveys, construction staking and <br />inspection. <br />The percentage figure shall be determined from Curve B-1971 as <br />shown on page 29 of the 1972 Edition of the American Society of <br />Civil Engineers Manual No. 45. Interpolation between tabulated <br />figures of this curve shall be straight-line. Payment of 85% of <br />the fee will be due within the period in which the plans and speci- <br />fications are prepared. During this period, monthly statements <br />will be presented to the CITY for the percentage of work completed <br />during each month of the design period. The remaining 15% of <br />the fee will be due in approximately equal monthly payments during <br />the construction period. <br />B Field Work. <br />(1) If field work, such as that described in subparagraph 11 B (6), <br />is performed by employees of the ENGINEER, the fee would <br />be an amount equal to the applicable portion of actual salary <br />costs for such work, plus a sum equal to 0. 90 times said <br />salary costs, plus reimbursement for travel and subsistence <br />outside of Pasadena and for field expenses. Salary costs <br />would be calculated on a straight -time basis, exclusive of <br />premiums for overtime. Travel, subsistence, and field <br />expenses in connection with this project would be charged <br />at actual cost. Use of personal or company vehicles would <br />be charged at the rate of 12 cents per vehicle -mile. <br />(2) If CITY requests ENGINEER to retain others to perform work <br />for this project, such as the foundation investigations (Sub- <br />paragraph 11 (B) (1), the ENGINEER's fee would be his direct <br />out-of-pocket costs, plus 15 percent of said costs for his <br />overhead and services. In addition, other expenses directly <br />attributable to the project shall be paid the ENGINEER at <br />actual cost. Payment shall be due within 30 days after receipt <br />by the CITY of the ENGINEER's statement for work performed. <br />(3) <br />
The URL can be used to link to this page
Your browser does not support the video tag.