My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Contracts & Agreements_14-1973
Kiosk Weblink
>
City Clerk
>
Contracts & Agreements
>
Independent Contractor Agreement
>
James M. Montgomery Consulting Engineers Inc
>
14-73
>
Contracts & Agreements_14-1973
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2019 11:06:34 AM
Creation date
8/13/2019 8:47:58 AM
Metadata
Fields
Template:
Contracts & Agreements
Subject
Independent Contractor Agreement
Details
James M. Montgomery Consulting Engineers Inc
Date
3/20/1973
Document Number
14-1973
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SZ Rev1ew of construction progress estimates and re^,^.3.-'�'.mcndia.tions <br />for progress and final payments to contractors. <br />9. Assistance in final inspection and testing. <br />10, Correction of plans to show "as -built" conditions. <br />D. Additional Services <br />If requested by the CITY the ENGINEER will provide the following <br />Additional Services: <br />1 . Meetings and negotiations with the contractors involving changes <br />in the extent or amount of the contracts, or changes in the approved <br />designs. <br />2. Processing Change Orders. <br />3. Additional work resulting from the delinquency or insolvency of one <br />or more of the contractors; or as a result of damage to the con- <br />struction project caused by fire, flood, earthquake or other acts <br />of God. <br />4. Additional work resulting from strikes, walkouts, or other acts <br />r �,._ �_ �_,_�_. _ <br />Of tfa dc. GI: fa'f -G ui 10TLs. <br />5. Preparation of changes to the approved plans and specifications <br />beyond the mere clarification of design details included in para- <br />graph II-C. 5. <br />6. Preparation of applications and supporting documents for govern- <br />ment grants or loans for public projects. <br />7. Design to provide for alternative bid items which are not constructed <br />under the construction contract on which the fee is based. <br />8. Work resulting from changes in plans or specifications made at <br />the direction of the CITY after acceptance of the preliminary design.. <br />9. Serve as witness in litigation. <br />E. Field Engineering Services <br />The following Field Engineering Services would be provided: <br />1. Field surveys to locate property boundaries and existing physical <br />features, and to develop detailed topography and profile data as <br />required for design of the proposed facilities. <br />- 3 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.