Laserfiche WebLink
said pipe line, said city shall excavate a trench at least five <br />(5) feet in depth upon and along the line of stF.'=es set therefor <br />by the City Engineer of said City and that said pipe to be so laid <br />shall be of first grade in -quality and shall be carefully laid and <br />in accordance v�ritlh specifications for the laying of sewers in said <br />City. <br />It is further understood that in the granting of said right <br />of gray, Viat said city shall cause the back filling of said trench <br />to be done with care and that the dirt shall be thoroughly settled <br />so the surface of t',e ground s"lall be left in a condition <br />acceptable to said grantor, and any surplus dirt that may remain <br />after such filling is so done, shall be removed by said city from <br />said orchard if so required by said grantor. <br />