Laserfiche WebLink
RECORDING REQUESTED BY <br />AND WHEN RECORDED MAIL TO: <br />CITY CLERK <br />CITY OF REDLANDS <br />P.O. BOX 3005 <br />REDLANDS, CA 92373 <br />FEES NOT REQUIRED <br />PER GOVERNMENT CODE <br />SECTION 6103 <br />0 Electronically <br />Recorded in Official Records <br />San Bernardino County <br />Bob Dutton <br />Assessor -Recorder -County Clerk <br />DOC# 2022-0250130 <br />07/19/2022 <br />08:32 AM <br />SAN <br />14311 <br />SPACE ABOVE THIS LINE FOR RECORDER'S USE <br />Titles: 1 <br />Fees <br />Taxes <br />CA SB2 Fee <br />Total <br />Pages: 11 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />STORMWATER TREATMENT DEVICE AND CONTROL MEASURE ACCESS <br />AND MAINTENANCE AGREEMENT <br />Assessor's Parcel Number(s) <br />0169-281-46, -51, -52, -53 <br />THIS AGREEMENT is made and entered into this I 0ii4 day of 3A.LY , 2022, by <br />and between Property One, LLC, A California limited liability company ("Owner"), and the City of <br />Redlands, a municipal corporation ("City"). The Owner and the City are sometimes each individually <br />referred to herein as a "Party" and, collectively, as the "Parties." <br />RECITALS <br />WHEREAS, the Owner owns real property ("Property") in the City specifically described in <br />Exhibits "A" and "B" which are attached hereto and incorporated herein by this reference; and <br />WHEREAS, at the time of approval of the Owner's development project commonly known <br />as Redlands Packing House East — SWC of Orange Street and Al Harris Lane, Redlands, CA 92374 <br />and filed as CRA No. 939 (the "Project"), the City required the Project to employ on -site control <br />measures to minimize pollutants in urban stormwater runoff; and <br />WHEREAS, the Owner has chosen to install Pervious Concrete Pavement (the "Devices") to <br />minimize pollutants in urban stormwater runoff; specifically described in Exhibit "C" and shown in <br />Exhibit "D" both of which are attached hereto and incorporated herein by this reference; and <br />WHEREAS, the Devices have been installed in accordance with plans and specifications <br />approved by the City and referred to as the Water Quality Maintenance Plan; and <br />City of Redlands <br />