My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Contracts & Agreements_135C-2022
Kiosk Weblink
>
City Clerk
>
Contracts & Agreements
>
Consulting Agreement
>
Kimley-Horn Environmental Consulting Private Project
>
135C-2022
>
Contracts & Agreements_135C-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2022 2:47:34 PM
Creation date
9/21/2022 11:17:36 AM
Metadata
Fields
Template:
Contracts & Agreements
Subject
Consulting Agreement
Details
Kimley-Horn Environmental Consulting Private Project Fifth Amendment
Date
7/1/2022
Document Number
135C-2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT <br />EXHIBIT "A" <br />SCOPE OF SERVICES <br />SCOPE OF WORK <br />Task 1. Mobilization <br />The Kimley-Hom environmental team will review available Project information, plans and studies, <br />as well as other available relevant information. Kimley-Horn will confirm the overall approach <br />and schedule with the City. Kimley-Horn will conduct a site visit to review existing conditions on <br />the properties and surrounding environment. <br />Task 2. Prepare Project Description <br />The Kimley-Hom environmental team will use information obtained in Task 1 and work closely <br />with City staff to prepare a draft Project Description for the California Environmental Quality Act <br />(CEQA) document. The Project Description will be prepared to the level of detail required by the <br />City for the entitlement approvals being sought. The draft Project Description will be sent to the <br />City for review and will be used as the basis for the IS Checklist, MND, and related technical <br />studies. <br />Task 3. Complete CEQA Technical Studies <br />Kimley-Hom will prepare and/or peer review the following technical studies to support the <br />IS/MND prepared for the Project. Kimley-Horn will also utilize, to the extent practical, available <br />reference documents and prior CEQA documents, including the City's General Plan Environmental <br />Impact Report (EIR). For each technical study, this proposal allows for two rounds of staff review, <br />assuming that for all submittal reviews staff comments are consolidated into one comment set, and <br />subsequent comments focus on the adequacy of addressing prior comments and do not raise new <br />issues. Each round of City staff review would be two weeks in length. <br />A) PEER REVIEW -Air Quality, Greenhouse Gas Emissions, Noise Assessments-Kimley- <br />Horn will peer review the Air Quality, Greenhouse Gas, and Noise technical studies that <br />were prepared for the proposed project. Written comments on the technical analysis will <br />be provided to the City. The review will consist of the following: <br />Review the analyses, including a review of all modeling data and assumptions; <br />Evaluate the adequacy of the methods used to conduct the various parts of the study in terms <br />of professional standards, regulatory standards, and CEQA Guidelines; <br />Evaluate the consultant's recommendations and conclusions based on CEQA <br />L:\ca\Agreements\Kimley-Ham Fifth Amend.FY21-0176.docx_jn <br />
The URL can be used to link to this page
Your browser does not support the video tag.