Laserfiche WebLink
PUBLIC WORK CONSTRUCTION CONTRACT <br />This Public Work Construction contract ("Contract") is made and entered into this 5th day of <br />September 2023, by and between the City of Redlands, a municipal corporation, organized and existing <br />under the laws of the State of California (hereinafter "City"), and California Professional Engineering, <br />Inc., a California corporation, (hereinafter "Contractor"). City and Contractor are sometimes <br />individually referred to herein as a "Party" and, together, as the "Parties." <br />In consideration of the mutual promises contained herein, City and Contractor agree as follows: <br />1. SCOPE OF WORK: Contractor shall furnish all materials and will perform all of the work for <br />the following: HSIP Cycle 9 Orange Blossom Trail Phase 3 Crossings, complete all items as <br />required by the Contract Documents (as herein defined) and Specifications for City's HSIP Cycle <br />9 Orange Blossom Trail Phase 3 Crossings, City Project No. 47033, Federal Project No. HSIPL <br />5083(024) (the "Work"). <br />2. CONTRACT SUM: City shall pay Contractor the sum of Two Hundred Fifty -Nine Thousand <br />Two Hundred Forty -Five dollars ($259,245) as consideration for its performance of the Work in <br />accordance with the terms and conditions set forth in the Contract Documents. Pursuant to Public <br />Contract Code Section 22300, Contractor has the option to deposit securities with an escrow agent <br />as a substitute for retention of earnings required to be withheld by City pursuant to an escrow <br />agreement as set forth in Public Contract Code section 22300. <br />3. TIME FOR COMPLETION: The Work shall be completed within One Hundred (100) calendar <br />days from and after the date of City's issuance of a Notice to Proceed to Contractor. <br />4. LIQUIDATED DAMAGES: Contractor's failure to complete the Work within the time allowed <br />will result in damages being sustained by City. Such damages are, and will continue to be, <br />impracticable and extremely difficult to determine. Accordingly, Contractor shall pay to City, or <br />have withheld from monies due to Contractor, the sum of Five Hundred dollars ($500) for each <br />consecutive calendar day in excess of the specified time for completion of the Work. Execution of <br />this Contract shall constitute agreement by City and Contractor that Five Hundred dollars ($500) <br />per day is the estimated damage to City caused by the failure of Contractor to complete the work <br />within the allowed time. Such sum is liquidated damages and shall not be construed as a penalty, <br />and may be deducted from payments due Contractor if such delay occurs. <br />5. CONTRACT DOCUMENTS: This Contract incorporates by reference the following: Notice <br />Inviting Bids, Instructions to Bidders, Contractor's Proposal, Bid Bond, Agreement, Performance <br />Bond, Labor and Material Bond, Plans, General Conditions, Special Provisions and Specifications, <br />and any addenda thereto (collectively, the "Contract Documents"). <br />6. ATTORNEYS' FEES: In the event any action is commenced to enforce or interpret the terms or <br />conditions of this Contract, or the Contract Documents, the prevailing Party in such action, in <br />addition to any costs and other relief, shall be entitled to recover its reasonable attorneys' fees, <br />including fees for use of in-house counsel by a Party. <br />1 <br />I:\cmo\Agreements\California Professional Engineering, Inc.-FY22-0218.doc-jm <br />