My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Contracts & Agreements_206-2023
Kiosk Weblink
>
City Clerk
>
Contracts & Agreements
>
Consulting Agreement
>
First Amendment Synagro-WWT orig agree 178-2022
>
206-2023
>
Contracts & Agreements_206-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2023 10:17:22 AM
Creation date
11/8/2023 10:17:15 AM
Metadata
Fields
Template:
Contracts & Agreements
Subject
Consulting Agreement
Details
First Amendment Synagro-WWT orig agree 178-2022
Date
11/7/2023
Document Number
206-2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "A" <br />SCOPE OF SERVICES <br />• Schedule: The contractor must supply a tractor (goat/mule) and trailer every day of <br />the week. City staff will coordinate with contractor as to real time needs, if needed. <br />Hauling of bio-solids is only to be scheduled Sunday -Saturday 06:OOAM-12:00PM, <br />Note* this includes all holidays. If Contractor -faces any challenges meeting the <br />schedule, the Contractor must notify the Wastewater Treatment Plant one (1) hour in <br />advance. <br />• Address: 1950 Nevada St. Redlands, CA 92374 <br />• Removal of municipal wastewater bin -solids from a Class I Sludge Management Facility <br />which have been physically treated by methods that include de -gritting, thickening, anaerobic <br />digestion, and dewatering by way of centrifuge. The estimated annual amount of bio-solids to <br />be removed from site is 5,600 dry metric tons with an average percent solid of 25% or less at <br />the time of hauling. <br />• Contractor must provide the tractor (goat/mule)/trailer that fits under a loading bay <br />platform structure measuring 112 inches high and 224 inches wide. This is <br />accomplished by the contractor delivering one empty trailer and taking the full trailer. <br />Tractor (goat/mule) must stay onsite and provided by Contractor. <br />16. <br />1.11r" INN 0101111711 Mill <br />1111 <br />L141 Ira <br />pleo <br />" <br />Ufa lIiJ <br />LOADING BAY <br />• Contractor shall provide adequate personnel who are appropriately licensed, certified, and <br />trained to perform the work outlined in the Scope of Services. <br />• Transportation of bio-solids shall follow all applicable regulations for waste hauling and <br />equipment used shall be appropriately licensed and permitted. <br />+ A chronologically numbered load ticket shall be provided to City staff for each load of bio- <br />solids removed from the site at the time of removal and shall be documented accordingly upon <br />submittal of invoice. <br />• Each load hauled off -site shall be weighted by a weigh station that maintains the appropriate <br />certifications for weights and measures and provides the contractor with a valid weight ticket. <br />The weight ticket shall be documented accordingly upon submittal of invoice. <br />• Pricing shall include all charges associated with the Scope of Service including, but not <br />limited to, personnel, tipping fees, weights and measures, equipment, and costs associated with <br />equipment including insurance, fuel, mileage, and supplies. <br />3 <br />1:\cmo\Agreements\Synugm-WW1', Inc. First Amendment FY22-0284,docx-msv2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.