Laserfiche WebLink
Live Oak Canyon Road Slurry Seal Improvements <br />construction codes, California Labor Code, and California Public Contract Code, and in accordance with <br />the encroachment permits issued by CITY. <br />6. Furnish a representative to perform the function of Resident Engineer during construction of CITY <br />PROJECT. <br />7. Furnish qualified support staff to assist the Resident Engineer in, but not limited to, construction surveys, <br />soils and compaction tests, measurement and computation of quantities, testing of construction materials, <br />checking submittals, preparation of estimates and reports, preparation of as -built drawings, and other <br />inspection and staff services necessary to assure that the construction is performed in accordance with the <br />PS&E documents. <br />8. Construct the CITY PROJECT in accordance with approved PS&E documents. <br />9. Submit any contract change order that causes the construction contract to exceed 10% of the contract bid <br />amount for CITY PROJECT improvements to CITY for review and approval prior to final authorization by <br />COUNTY. If any contract change order causes the construction contract to change by less than 10% of <br />the bid amount for CITY PROJECT, COUNTY is authorized by CITY's approval of this Agreement to move <br />forward with such change. <br />10. Furnish CITY a final reconciliation of CITY PROJECT expenses within ninety (90) days following the <br />completion and acceptance of the COUNTY PROJECT and CITY PROJECT construction contract. If final <br />costs associated with the CITY PROJECT are in excess of the Deposit provided in Section 2, COUNTY <br />shall include a final bill with the financial reconciliation. If final costs associated with the CITY PROJECT <br />are less than the Deposit provided in Section 2, COUNTY shall include a reimbursement for the difference <br />with the financial reconciliation. <br />11. Provide CITY one complete set of reproducible as -built plans and all contract documents including <br />calculations, estimates, and other documents produced as part of this contract within ninety (90) days after <br />completion and acceptance of the CITY PROJECT. <br />SECTION 2 • CITY AGREES to: <br />1. Fund one hundred percent (100%) of the cost of the CITY PROJECT, as shown in Exhibit "B". CITY agrees <br />that should unforeseen circumstances arise which result in an increase of any costs over those shown in <br />County of Riverside & City of Redlands Service Agreement <br />3 <br />