Laserfiche WebLink
AGREEMENT TO PERFORM PROFESSIONAL SERVICES <br />This agreement for the provision of Engineering and Design Services for Traffic Signal <br />Head Ilprovement ("Agreement") is made and entered in this 17lh day of December, 2024 <br />("Effective Date"), by and between the City of Redlands, a municipal corporation ("City") and <br />AGA Engineers, Inc., a California corporation ("Consultant"). City and Consultant are sometimes <br />individually referred to herein as a "Party" and, together, as the "Parties." In consideration of the <br />mutual promises contained herein, City and Consultant agree as follows: <br />ARTICLE 1 — ENGAGEMENT OF CONSULTANT <br />1.1 City hereby engages Consultant to provide Engineering and Design Services for Traffic <br />Signal Head Improvement services for City (the "Services"). <br />1.2 The Services shall be performed by Consultant in a professional manner, and Consultant <br />represents that it has the skill and the professional expertise necessary to provide the <br />Services to City at a level of competency presently maintained by other practicing <br />professional consultants in the industry providing like and similar types of Services. <br />ARTICLE 2 — SERVICES OF CONSULTANT <br />2.1 The Services that Consultant shall perform are more particularly described in Exhibit "A," <br />titled "Scope of Services," which is attached hereto and incorporated herein by this <br />reference. <br />2.2 Consultant shall comply with applicable federal, state and local laws and regulations in the <br />performance of this Agreement including, but not limited to, any applicable State <br />prevailing wage laws. <br />ARTICLE 3 —RESPONSIBILITIES OF CITY <br />3.1 City designates John R. Harris, Municipal Utilities and Engineering Department Director, <br />as City's representative with respect to performance of the Services, and such person shall <br />have the authority to transmit instructions, receive information, interpret and define City's <br />policies and decisions with respect to performance of the Services. <br />ARTICLE 4 — PERFORMANCE OF SERVICES <br />4.1 Consultant shall perform and complete the Services in a prompt and diligent manner in <br />accordance with the schedule set forth in Exhibit "B," titled "Project Schedule," which is <br />attached hereto and incorporated herein by reference. <br />4.2 Consultant shall complete the Services by March 31, 2026, unless the Services are <br />terminated earlier as provided for herein. <br />I:\crno\Agreements\AGA Engineers, Inc. (Traffic Signal Head Improvement) Agreement FY24-0080.docx-msv2 <br />