My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Contracts & Agreements_168-2025
Kiosk Weblink
>
City Clerk
>
Contracts & Agreements
>
Public Works Construction Contract
>
Tryco General Engineering for 2025 CIP Sewer Pipeline Replacement Project
>
168-2025
>
Contracts & Agreements_168-2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2025 10:38:14 AM
Creation date
9/3/2025 10:37:52 AM
Metadata
Fields
Template:
Contracts & Agreements
Subject
Public Works Construction Contract
Details
Tryco General Engineering for 2025 CIP Sewer Pipeline Replacement Project
Date
9/2/2025
Document Number
168-2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORK CONSTRUCTION CONTRACT <br />This Public Work Construction contract ("Contract") is made and entered into this 2"d day of September, <br />2025, by and between the City of Redlands, a municipal corporation, organized and existing under the <br />laws of the State of Califomia (hereinafter "City"), and Tryco General Engineering, a California <br />corporation (hereinafter "Contractor"). City and Contractor are sometimes individually referred to herein <br />as a "Party" and, together, as the "Parties." <br />In consideration of the mutual promises contained herein, City and Contractor agree as follows: <br />1. SCOPE OF WORK: Contractor shall furnish all materials and will perform all of the work for the <br />following: 2025 CIP SEWER PIPELINE REPLACEMENT PROJECT, complete all items as <br />required by the Contract Documents (as herein defined) and Specifications for City's 2025 CIP <br />SEWER PIPELINE REPLACEMENT PROJECT, Project No. 521040 (the "Work"). <br />2. CONTRACT SUM: City shall pay Contractor the sum of One Million Four Hundred Ninety -Four <br />Thousand Five Hundred Sixteen Dollars ($1,494,516) as consideration for its performance of the <br />Work in accordance with the terms and conditions set forth in the Contract Documents. Pursuant to <br />Public Contract Code Section 22300, Contractor has the option to deposit securities with an escrow <br />agent as a substitute for retention of earnings required to be withheld by City pursuant to an escrow <br />agreement as set forth in Public Contract Code section 22300. <br />TIME FOR COMPLETION: The Work shall be completed within sixty (60) working day(s) as <br />defined in Section 1-2 of the Standard Specifications for Public Works Construction "Greenbook" <br />from and after the date of City's issuance of a Notice to Proceed to Contractor. <br />4. LIQUIDATED DAMAGES: Contractor's failure to complete the Work within the time allowed <br />will result in damages being sustained by City. Such damages are, and will continue to be, <br />impracticable and extremely difficult to determine. Accordingly, Contractor shall pay to City, or <br />have withheld from monies due to Contractor, the sum of five hundred dollars ($500) for each <br />working day as defined in Section 1-2 of the Standard Specifications for Public Works Construction <br />"Greenbook" in excess of the specified time for completion of the Work. Execution of this Contract <br />shall constitute agreement by City and Contractor that five hundred dollars ($500) per day is the <br />estimated damage to City caused by the failure of Contractor to complete the work within the <br />allowed time. Such sum is liquidated damages and shall not be construed as a penalty, and may be <br />deducted from payments due Contractor if such delay occurs. <br />5. CONTRACT DOCUMENTS: This Contract incorporates by reference the following: Notice <br />Inviting Bids, Instructions to Bidders, Contractor's Proposal, Bid Bond, Agreement, Performance <br />Bond, Labor and Material Bond, Plans, General Conditions, Special Provisions and Specifications, <br />and any addenda thereto (collectively, the "Contract Documents"). <br />6. ATTORNEYS' FEES: In the event any action is commenced to enforce or interpret the terms or <br />conditions of this Contract, or the Contract Documents, the prevailing Party in such action, in <br />addition to any costs and other relief, shall be entitled to recover its reasonable attorneys' fees, <br />including fees for use of in-house counsel by a Party. <br />1 <br />1:\emo\Agreeaonts\Tryeo General Fngureering (2025 CIP Sower Pipeline Replacement Project) FY2526-014.docx-ins <br />
The URL can be used to link to this page
Your browser does not support the video tag.