My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Deeds & Easements_10-2016E
Kiosk Weblink
>
City Clerk
>
Deeds & Easements
>
Right of Way Certification
>
Caltrans install traffic signals, turn phasing at Pioneer Ave & Orange Street; local assistance project, off state highway system
>
10-16E
>
Deeds & Easements_10-2016E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 8:05:59 AM
Creation date
7/12/2016 12:07:12 PM
Metadata
Fields
Template:
Deeds & Easements
Document Number
10-2016E
Date
6/7/2016
Name
Right of Way Certification
APN
Caltrans install traffic signals, turn phasing at Pioneer Ave & Orange Street; local assistance project, off state highway system
Recorded Number
0000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Assistance Procedures Manual EXHIBIT 13-A <br /> Short Form Right of Way Certification Local Assistance Project <br /> EXHIBIT 13-A SHORT FORM RIGHT OF WAY CERTIFICATION <br /> LOCAL ASSISTANCE PROJECT <br /> (Off-State Highway System Project) <br /> CITY OF REDLANDS <br /> NAME OF THE LOCAL PUBLIC AGENCY <br /> NOTE: <br /> This form is intended for projects that do NOT require <br /> R/W acquisition,relocation assistance,have NO railroad I-1SIP-5083(016) <br /> involvement,and the ONLY Utility Relocation Project ID <br /> involvement is limited to utility cover adjustments. <br /> For each item below, except Item„5,select the ONE PIONEER AVENUE/ORANGE STREET <br /> option most suitable to your project. If the chosen Project Location <br /> option directs you to use Exhibit 13-13,please stop. This <br /> Short Form is not applicable to your proms INS"T"ALL TRAFFIC SIGNALS AND TURN PHASING <br /> General Description <br /> RIGHT OF WAY CERTIFICATION No. 1 <br /> 1. STATUS OF REQUIRED PROPERTY RIGHTS <br /> No acquisition of right of way is required. All proposed work is within existing right of way. <br /> Right of way has been acquired in accordance with applicable policy and procedure covering the <br /> acquisition of real property. LPA has legal and physical possession,right to enter, and required permits. <br /> If this box is checked,please use Exhibit 13-B. <br /> 2. STATUS OF AFFECTED OPERATING RAILROAD FACILITIES <br /> FX <br /> None affected. <br /> ❑ The CITY OF REDLANDS Railroad has approved the proposed work,which is within their <br /> Right of Way but does not require the adjustment of railroad facilities.The necessary clauses will be <br /> placed in the contract special provisions. If this box is checked,please use Exhibit 13-B. <br /> The CITY OF REDLANDS Railroad(and when needed,the Public Utilities Commission)has <br /> approved the proposed work,which is within the railroad right of way and does require the adjustment <br /> of railroad facilities.The railroad, or its contract forces,will provide the necessary labor,materials <br /> and/or equipment to adjust their facilities.The necessary clauses will be placed in the contract special <br /> provisions. If this box is checked,please use Exhibit 13-B. <br /> 3. MATERIAL SITES) <br /> None required. <br /> ❑ Material site(s)required. If this box is checked,please use Exhibit 13-B. <br /> Page 1 of 6 <br /> LPP 13-02 December 30,2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.