My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Contracts & Agreements_32A-1970
Kiosk Weblink
>
City Clerk
>
Contracts & Agreements
>
Independent Contractor Agreement
>
J. C. Milne Mausoleum Building at Hillside Memorial Park
>
32A-70
>
Contracts & Agreements_32A-1970
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2019 9:09:46 AM
Creation date
7/30/2019 11:40:47 AM
Metadata
Fields
Template:
Contracts & Agreements
Subject
Independent Contractor Agreement
Details
J. C. Milne Mausoleum Building at Hillside Memorial Park
Date
12/21/1970
Document Number
32A-1970
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G S �Y <br />�Q THE AMERICAN INSTITUTE OF ARCHITECTS <br />AIA Document B131 <br />Standard Form of Agreement Between <br />Owner and Architect <br />on a basis of a <br />PERCENTAGE OF CONSTRUCTION COST <br />AGREEMENT <br />Twenty-first December <br />made this 4!pNQ4 day of pep in the year of Nineteen <br />Hundred and seventy <br />BETWEEN <br />City of Redlands, California, the Owner, and <br />J. C. Milne, Registered Engineer, the Architect. <br />All references in this document to "Architect" shall be construed to mean "Engineer". <br />It is the intention of the Owner to construct a mausoleum building at Hillside Memorial <br />Park <br />hereinafter referred to as the Project. <br />The Owner and the Architect agree as set forth below. <br />AIA DOCUMENT B131 • OWNER -ARCHITECT AGREEMENT • SEPTEMBER 1967 EDITION • AIAO <br />©1967 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 N. Y. AVE., N.W., WASH., D. C. 20006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.